Offshore Technology Conference 1980
DOI: 10.4043/3837-ms
|View full text |Cite
|
Sign up to set email alerts
|

Loadout To Installation Of The Muchison Jacket

Abstract: At 25500 tonnes, the heaviest ever barge launched steel jacket for Conoco North Sea was successfully installed in the Murchison field last August after transfer from the fabrication yard in Scotland. The technology involved in manoeuvring a large barge launched jacket from the fabrication yard to the installation site has only been put to the test preViously for jackets smaller than Murchison. Outlined here are some of the features, as seen by the consulting engineers responsible for the design, in taking the … Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles