Load‐limited order release in job shop scheduling systems

Abstract: This report examines the practice of using work load limits to control the release of orders to a job shop. Load limits function in the following general way. Whenever the inventory of work at a work center exceeds some critical value (its “load limit”), further release of orders which are routed to that work center are blocked from entering the shop. After the inventory is “worked off,” release of work to the shop gateways is again permitted. Load‐limited order release is intuitively appealing because it appe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
45
0

Year Published

1992
1992
2022
2022

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 70 publications
(46 citation statements)
references
References 4 publications
1
45
0
Order By: Relevance
“…This means that the further downstream the bottleneck is positioned, the more jobs should be allowed to be on their way to the bottleneck (and still at upstream stations). This means that DBR's limit needs to be continuously adjusted to obtain stable performance, avoiding both a loss of control, leading to congestion, and control that is too tight, resulting in premature station idleness (Kanet, 1988). Meanwhile, SA COR accounts for the interdependency between the limit and the bottleneck position by using the corrected aggregate load to automatically allow more work to be on its way to a station the further downstream a station is located.…”
Section: Discussion: What Does This Mean For Bottleneck Shiftiness?mentioning
confidence: 99%
“…This means that the further downstream the bottleneck is positioned, the more jobs should be allowed to be on their way to the bottleneck (and still at upstream stations). This means that DBR's limit needs to be continuously adjusted to obtain stable performance, avoiding both a loss of control, leading to congestion, and control that is too tight, resulting in premature station idleness (Kanet, 1988). Meanwhile, SA COR accounts for the interdependency between the limit and the bottleneck position by using the corrected aggregate load to automatically allow more work to be on its way to a station the further downstream a station is located.…”
Section: Discussion: What Does This Mean For Bottleneck Shiftiness?mentioning
confidence: 99%
“…The continuous trigger avoids premature station idleness (see, e.g. Kanet, 1988;Land & Gaalman, 1998). When the continuous workload trigger releases a job, its workload contribution to a station is calculated using the same corrected aggregate load approach as used for the periodic release time element of LUMS COR.…”
Section: Order Release Controlmentioning
confidence: 99%
“…This relationship between capacity load and throughput time has been studied by Bertrand 1981Bertrand 8 , 1983 b , Baker 1984, Kanet 1988, Bechte 1982, Karmarkar 1987, and Wein and Chevalier 1992 On the one hand, this research has resulted in procedures to generate workload dependent work order due dates which largely improve the due date performance as compared to the performance of their workload independent counterparts (i.e. Ellon andChowdhuny 1976, Bertrand 1983 8 , Baker and Bertrand 1981).…”
Section: Integrating Materials Coordination and Capacity Load Smoothingmentioning
confidence: 99%