2018 IEEE/PES Transmission and Distribution Conference and Exposition (T&D) 2018
DOI: 10.1109/tdc.2018.8440485
|View full text |Cite
|
Sign up to set email alerts
|

Load Aggregation Methods for Quasi-Static Power Flow Analysis on High PV Penetration Feeders

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
4
2
1

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 4 publications
0
6
0
Order By: Relevance
“…The PECAN STREET project residential load data set from Jan 1 to June 30, 2017, is used in this research work [37]. Based on the results of the load profile aggregation (LPA) algorithm proposed in [38] for the IEEE 123-bus test feeder, there are average 8 houses on each bus with 3.5 kW peak load/house. The capacity of the rooftop PV installed at each house on branch nodes is 6 kW.…”
Section: B Ieee 123-bus Test Networkmentioning
confidence: 99%
“…The PECAN STREET project residential load data set from Jan 1 to June 30, 2017, is used in this research work [37]. Based on the results of the load profile aggregation (LPA) algorithm proposed in [38] for the IEEE 123-bus test feeder, there are average 8 houses on each bus with 3.5 kW peak load/house. The capacity of the rooftop PV installed at each house on branch nodes is 6 kW.…”
Section: B Ieee 123-bus Test Networkmentioning
confidence: 99%
“…To better model load diversity in the distribution feeders, a feeder load disaggregation algorithm is used to disaggregate the feeder head load profile to each load node using smart meter data provided by Duke Energy. Details for the disaggregation method were introduced in [8].…”
Section: A Transmission and Distribution Systems Modelingmentioning
confidence: 99%
“…The error is modeled as Gaussian variance and added to the measurements. The other detailed parameters of the network are from references [26,27].…”
Section: Case Studymentioning
confidence: 99%
“…The error is modeled as Gaussian variance and added to the measurements. The other detailed parameters of the network are from references [26,27]. The installed capacities of DG-1 to DG-7 are 0.5, 1.3, 0.68, 0.48, 1.42, 0.71, 1.08 MW, respectively.…”
Section: Online Dynamic Characteristics Assessment In a Single Time Windowmentioning
confidence: 99%