2010 IEEE International Conference on Software Engineering and Service Sciences 2010
DOI: 10.1109/icsess.2010.5552416
|View full text |Cite
|
Sign up to set email alerts
|

Live virtual machine migration based on improved pre-copy approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
23
1
1

Year Published

2011
2011
2022
2022

Publication Types

Select...
4
4
2

Relationship

0
10

Authors

Journals

citations
Cited by 71 publications
(25 citation statements)
references
References 6 publications
0
23
1
1
Order By: Relevance
“…The study indicated that our approach saves the total migration time by at least 65% and at most 75% in the memory intensive environment. This is in contrast to previous work in which, in the memory intensive environment, migration takes a long time or reaches a deadlock [6], [8]- [10]. In same environment, our approach can reduce more the total migration time compared to MECOM as much as 40%.…”
Section: Resultscontrasting
confidence: 48%
“…The study indicated that our approach saves the total migration time by at least 65% and at most 75% in the memory intensive environment. This is in contrast to previous work in which, in the memory intensive environment, migration takes a long time or reaches a deadlock [6], [8]- [10]. In same environment, our approach can reduce more the total migration time compared to MECOM as much as 40%.…”
Section: Resultscontrasting
confidence: 48%
“…Live migration has two phases: In the first phase, the RAM content and the state of the virtual machine are iteratively copied to the target server while the VM executes in the source server. In the second phase, the VM is stopped briefly to prevent further memory updates, the latest updates are copied to the target server, and the VM is started in the target server [17], [18]. These phases require computation and communication resources and introduce VM down-time (phase two).…”
Section: ) Migration Timementioning
confidence: 99%
“…클라우드 컴퓨팅 환경에서 해당 부하를 동적으로 재배 치시키는 이주 기법은 스토리지 복제와 가상머신의 이주 의 순서에 따라 선 복제 모델(pre-copy) [5] 과 후 복제(postcopy) [5] …”
Section: Storage Copy Schemeunclassified