Literature Review of Advanced Reactor Cost Estimates

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 14 publications
0
4
0
Order By: Relevance
“…Some SMR developers have released cost estimates for their designs, and various prior studies have compiled this type of data (Vegel and Quinn, 2017;EIRP, 2021;Stewart and Shirvan, 2022;Asuega et al, 2023;Steigerwald et al, 2023). Furthermore, various meta studies on the cost ranges of SMRs have developed results on expected SMR costs with uncertainty measures (Petti et al, 2018;SMR Start, 2021;EIA, 2022;Stein et al, 2022;Abou Jaoude et al, 2023).…”
Section: Capital and Oandm Literature Surveymentioning
confidence: 99%
“…Some SMR developers have released cost estimates for their designs, and various prior studies have compiled this type of data (Vegel and Quinn, 2017;EIRP, 2021;Stewart and Shirvan, 2022;Asuega et al, 2023;Steigerwald et al, 2023). Furthermore, various meta studies on the cost ranges of SMRs have developed results on expected SMR costs with uncertainty measures (Petti et al, 2018;SMR Start, 2021;EIA, 2022;Stein et al, 2022;Abou Jaoude et al, 2023).…”
Section: Capital and Oandm Literature Surveymentioning
confidence: 99%
“…Previous work in this space includes an array of top-down meta-studies where authors have taken high level overnight capital cost (OCC) estimates and aggregated the values to produce OCC ranges (Abou Jaoude 2023, Steigerwald et al 2023, Asuega, Limb, and Quinn 2023, Breakthrough Institute 2022, Vegel and Quinn 2017, EIRP 2021. Other existing studies have used a more bottoms-up approach, where authors look at specific costs of reactors and then aggregate them up to OCC (EIA 2022, SMR Start 2021, Petti 2018.…”
Section: Previous Workmentioning
confidence: 99%
“…Nuclear- Several studies have attempted to quantify the potential costs of advanced reactors for terrestrial deployment [126,127,128,129]. Most recently, an Idaho National Laboratory (INL) study conducted a comprehensive survey of existing literature to assess recommended ranges for nuclear cost estimates [130]. These overnight costs mainly consist of construction, equipment, installation, indirect, and commissioning costs (decommissioning costs are not typically considered here).…”
Section: » Pennsylvania Bureau Of Radiation Protectionmentioning
confidence: 99%
“…This can be helpful in the context of demonstrations to understand the two key drivers for reducing costs: low FOAK costs and fast learning. Abou-Jaoude et al provide a survey of the applicable literature and estimated that suitable learning rates for nuclear applications would be around 5, 10, and 15% for low, medium, and high estimates [130]. As shown in Figure 39, the cost relative to the FOAK can drop by as much as 30% after 100 units with a 5% learning rate.…”
Section: » Pennsylvania Bureau Of Radiation Protectionmentioning
confidence: 99%