All Days 2006
DOI: 10.2118/99188-ms
|View full text |Cite
|
Sign up to set email alerts
|

Liner Hanger Trapped Annulus Pressure Issues at the Magnolia Deepwater Development

Abstract: ConocoPhillips is developing the Magnolia field with a Tension Leg Platform (TLP) in 4,674 ft of water at Garden Banks block 783 in the Gulf of Mexico. The wells are completed using dry trees from the TLP. The production casing for each well consists of an 8.062 in. liner set near the base of a 10.75 in. liner. The 10.75 in. liner is tied back to the subsea wellhead. The subsea wellhead is tied back to the TLP with an 11.75 in. production riser. To minimize heat loss in the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2006
2006
2018
2018

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
references
References 5 publications
0
0
0
Order By: Relevance