2018
DOI: 10.1002/9781119509479
|View full text |Cite
|
Sign up to set email alerts
|

Linear Programming and Resource Allocation Modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(10 citation statements)
references
References 0 publications
0
8
0
Order By: Relevance
“…Machine cost depends on the site's selected capacity, and construction cost depends on village status, as discussed in the Data section below. falsek()1200Sk+CconskxkB where xk is a 0, 1 integer variable, which equals 1 if site k is selected for an MHP project and 0 otherwise. Capacity constraint: Total new capacity in village j ()kKj0.25emSk cannot exceed the capacity shortfall in village j ()Dj. falsekKj0.25emSkDj2.25emj0.25em Maximum capacity constraint: To enforce the relationship between new generation capacity ()Sk and the decision as to whether to develop site (xk), we include the following constraint in which Nk is the maximum possible new capacity at the site (kW). SkNkxk0.5emk Linearity transformation of the second objective: The second objective is a non‐linear function because of the absolute value function. We need to transform it into a linear function by introducing a new variable fi0.25em and the following constraints (Panik, 2019). fifalsekKiSkfalsejJiDjfalsekSkfalsejDj2.25em0.25emnormali …”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Machine cost depends on the site's selected capacity, and construction cost depends on village status, as discussed in the Data section below. falsek()1200Sk+CconskxkB where xk is a 0, 1 integer variable, which equals 1 if site k is selected for an MHP project and 0 otherwise. Capacity constraint: Total new capacity in village j ()kKj0.25emSk cannot exceed the capacity shortfall in village j ()Dj. falsekKj0.25emSkDj2.25emj0.25em Maximum capacity constraint: To enforce the relationship between new generation capacity ()Sk and the decision as to whether to develop site (xk), we include the following constraint in which Nk is the maximum possible new capacity at the site (kW). SkNkxk0.5emk Linearity transformation of the second objective: The second objective is a non‐linear function because of the absolute value function. We need to transform it into a linear function by introducing a new variable fi0.25em and the following constraints (Panik, 2019). fifalsekKiSkfalsejJiDjfalsekSkfalsejDj2.25em0.25emnormali …”
Section: Methodsmentioning
confidence: 99%
“…We need to transform it into a linear function by introducing a new variable f i and the following constraints (Panik, 2019).…”
Section: Capacity Constraint: Total New Capacity In Village Jmentioning
confidence: 99%
“…A full chapter on sensitivity analysis may be found in Eiselt et al [5]. A more up to date version can be found in Panik [6].…”
Section: Ridley Et Al Journal Of Applied Mathematics and Physicsmentioning
confidence: 99%
“…The proposed implementation methods turned out to be more effective and flexible than the methods of mathematical programming usually applied to such problems [5,9,18]. This concerned both the hybrid approach (Section 4.1) and the dedicated genetic algorithm (Section 4.2) developed by the authors.…”
Section: Literature Reviewmentioning
confidence: 99%