2018
DOI: 10.1016/j.nme.2018.04.011
|View full text |Cite
|
Sign up to set email alerts
|

Linear IFMIF Prototype Accelerator (LIPAc): Installation activities for Phase-B beam commissioning in Rokkasho

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…Nowadays, with the target fusion power reduction of the less ambitious demonstration reactors, the needs of dpa/fpy of a fusion relevant neutron source follows, hence one only accelerator is considered in the proposed facilities [106,108], with a substantial facility simplification and construction cost reduction involved. The success of the IFMIF/ EVEDA phase [64,91] in its assigned tasks in the engineering design of IFMIF [89] and general validation activities of a Li(d,n) neutron source facility [79,92] with the construction and operation of full scale prototypes of all the sub-facilities involved [93][94][95][96][97] and the on-going validation of the accelerator facility [150] allow the accurate anticipation of schedule and cost. Its construction can only be subject of an international collaboration, given that, though the cost is affordable (<5% of a demonstration fusion reactor), the technology involved is not available in a single country to face its construction on a timely manner.…”
Section: Discussionmentioning
confidence: 99%
“…Nowadays, with the target fusion power reduction of the less ambitious demonstration reactors, the needs of dpa/fpy of a fusion relevant neutron source follows, hence one only accelerator is considered in the proposed facilities [106,108], with a substantial facility simplification and construction cost reduction involved. The success of the IFMIF/ EVEDA phase [64,91] in its assigned tasks in the engineering design of IFMIF [89] and general validation activities of a Li(d,n) neutron source facility [79,92] with the construction and operation of full scale prototypes of all the sub-facilities involved [93][94][95][96][97] and the on-going validation of the accelerator facility [150] allow the accurate anticipation of schedule and cost. Its construction can only be subject of an international collaboration, given that, though the cost is affordable (<5% of a demonstration fusion reactor), the technology involved is not available in a single country to face its construction on a timely manner.…”
Section: Discussionmentioning
confidence: 99%
“…Phase B in 2019 [7]. Since August of 2019, Phase B+ had been started with the new configuration, dismantling the LPBD, installing MEBT Extension Line (MEL) which extended transport line from MEBT to be replaced with SRF LINAC at further beam operation phase, HEBT, a high power beam dump (hereafter BD) and changing the location of D-Plate to between the first triplet and the second doublet quadrupoles in HEBT.…”
Section: Jinst 19 T05013mentioning
confidence: 99%
“…These can be identified in the conceptual schema of Figure 6.23 [J4], [76], [212]. Article [222] illustrate the LIPAc components and layout. For more clear idea, Figure 6.24 shows the critical areas where these components are.…”
Section: Rh Maintenance Proceduresmentioning
confidence: 99%