2014 Australasian Universities Power Engineering Conference (AUPEC) 2014
DOI: 10.1109/aupec.2014.6966553
|View full text |Cite
|
Sign up to set email alerts
|

Limit equation for mitigation of the temporary over voltage issue following the Network Control System Protection Scheme action

Abstract: TasNetworks own and operate the Network Control System Protection Scheme and provide this service to Basslink Pty. Ltd. NCSPS was designed and implemented to maximise the power transfer capacity on transmission corridor. Due to the evolution of the Tasmanian power system, there is a need to review the network security risks of Temporary Over Voltage (TOV) following certain NCSPS action at Hadspen-George Town 220 kV transmission corridor. Appropriate limit advice and constraint equations are developed and invok… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 7 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?