Proceedings of SPE Annual Technical Conference and Exhibition 2005
DOI: 10.2523/97034-ms
|View full text |Cite
|
Sign up to set email alerts
|

Life-Cycle Profile Control in Subhydrostatic Wells of South Oman

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2007
2007
2007
2007

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…If a completion is run with 4 ½" liner and EZIP packers with perforated or blank pipe over the inflow segments ( Figure 6), then any future inflow profile modification will require a work over of the well with a hoist or coiled tubing unit to either pump chemicals or to install packers or patches [8].…”
Section: Selection Of Re-completion Typementioning
confidence: 99%
“…If a completion is run with 4 ½" liner and EZIP packers with perforated or blank pipe over the inflow segments ( Figure 6), then any future inflow profile modification will require a work over of the well with a hoist or coiled tubing unit to either pump chemicals or to install packers or patches [8].…”
Section: Selection Of Re-completion Typementioning
confidence: 99%