2020
DOI: 10.3390/buildings10060112
|View full text |Cite
|
Sign up to set email alerts
|

Life Cycle Prediction and Maintenance of Buildings

Abstract: The sustainability of the built environment can only be achieved through the maintenance planning of built facilities during their life cycle, considering social, economic, functional, technical, and ecological aspects [...]

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 15 publications
(5 citation statements)
references
References 12 publications
0
5
0
Order By: Relevance
“…Over time, the residential building industry has grown by incorporating new technologies in different construction phases, including planning and execution [82]. Building professionals should also be aware of the current techniques and information to optimize executions, maintenance, rehabilitation procedures, belief in the mechanism of degradation, and the risk of quality over time [83]. VM represents one of the most important technologies to enhance projects.…”
Section: Discussionmentioning
confidence: 99%
“…Over time, the residential building industry has grown by incorporating new technologies in different construction phases, including planning and execution [82]. Building professionals should also be aware of the current techniques and information to optimize executions, maintenance, rehabilitation procedures, belief in the mechanism of degradation, and the risk of quality over time [83]. VM represents one of the most important technologies to enhance projects.…”
Section: Discussionmentioning
confidence: 99%
“…Functional construction design and maintainability design have equal importance to the life span and cost of a system or a component (Guo et al , 2018). Construction of facilities, systems and components should (be made to) support their future maintenance throughout their life cycle (de Brito and Silva, 2020). Two USM factors are validated under the construction stage.…”
Section: Resultsmentioning
confidence: 99%
“…However, the above study failed to account for several crucial characteristics, including human resources, flexibility, and technical capability, leaving the study incomplete. In addition, none of the studies that attempted to prioritize the M&R technique (e.g., [29,30]) accounted for extremely constrained and unequally distributed resources [31]. As revealed by Vanier et al [32], selection of M&R techniques is largely dependent on the weights assigned to elements by evaluators, which vary based on culture and organizational necessity.…”
Section: Building Maintenance and Repair Management In Healthcare Bui...mentioning
confidence: 99%