2018
DOI: 10.1108/jqme-05-2017-0032
|View full text |Cite
|
Sign up to set email alerts
|

Life cycle cost analysis of the ventilation system in Stockholm’s road tunnels

Abstract: Swedish Transport Administration (Trafikverket) invests millions of dollars, into its annual budgets to purchase heavy equipment. Given the enormous costs of acquiring, operating and maintaining these assets, it is important to optimise their replacement. This study presents a practical economic replacement decision model to identify the economic lifetime of the ventilation system used by Trafikverket in its Stockholm tunnels. The proposed data driven optimisation model considers operating and maintenance cost… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0
1

Year Published

2020
2020
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(9 citation statements)
references
References 8 publications
0
8
0
1
Order By: Relevance
“…As a result, reducing the initial construction cost, the decision-makers compromise the environmental and social entities. A sustainable infrastructure multi-criteria preference assessment of alternative for early design (SIMPLE-Design) strategy was formulated, which incorporates the indifference curve to assess the decision-makers in dealing with the back-and-forth relationship between different alternatives [125]. Whereas the indifference curve needs to be further extended with the inclusion of more trade-off entities to improve the decisionmaking in diverse scope.…”
Section: Integrated Lca and Lccamentioning
confidence: 99%
See 1 more Smart Citation
“…As a result, reducing the initial construction cost, the decision-makers compromise the environmental and social entities. A sustainable infrastructure multi-criteria preference assessment of alternative for early design (SIMPLE-Design) strategy was formulated, which incorporates the indifference curve to assess the decision-makers in dealing with the back-and-forth relationship between different alternatives [125]. Whereas the indifference curve needs to be further extended with the inclusion of more trade-off entities to improve the decisionmaking in diverse scope.…”
Section: Integrated Lca and Lccamentioning
confidence: 99%
“…The LCCA, future cash flows, feedback, and incorporating the project performance with sustainability can assess the process of decision making towards the selection of sustainable options for a construction project. Interpreting the principle of LCA with LCCA to demonstrate the sustainability that asses the quality, time, and cost of a project [6], which is very useful for new and repairable systems because, at some point in their life span, their operating and maintenance costs and impact will exceed their acquisition costs [125].In many studies, the researchers developed some models or frameworks that try to minimize the limitation of the existing methodologies for specific parameter or areas. He, et al [134] developed a Decision support system with the integration of LCA and LCCA which allows the practitioners to evaluate a sustainable project alternative by identifying economic, social, and environmental impact.…”
Section: Integrated Lca and Lccamentioning
confidence: 99%
“…The LCCA, future cash flows, feedback, and incorporating the project performance with sustainability can assess the process of decision making towards the selection of sustainable options for a construction project. Interpreting the principal of LCA with LCCA to demonstrate the sustainability that asses the quality, time and cost of a project [6], which is very useful for new and repairable systems because, at some point in their life span, their operating and maintenance costs and impact will exceed their acquisition costs [117].…”
Section: Integrated Lca and Lccamentioning
confidence: 99%
“…Life Cycle Cost (LCC) adalah perhitungan berupa penjumlahan perkiraan biaya dari awal hingga akhir waktu suatu peralatan atau proyek sebagaimana ditentukan oleh studi analisis dan perkiraan total biaya yang dialami selama hidup. (Al-Chalabi, 2017) II. TINJAUAN PUSTAKA…”
Section: Pendahuluanunclassified