2020
DOI: 10.1016/j.epsr.2020.106635
|View full text |Cite
|
Sign up to set email alerts
|

Learning to run a power network challenge for training topology controllers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
65
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 46 publications
(79 citation statements)
references
References 5 publications
0
65
0
Order By: Relevance
“…The dataset for the IEEE 14-bus model contains 1000 scenarios with data for 28 continuous days in a 5minute interval. Each scenario includes pre-determined load variations and generation schedules which are representative of distributions of the French grid [7]. In this study only the first week of each scenario will be used.…”
Section: Power System Frameworkmentioning
confidence: 99%
See 4 more Smart Citations
“…The dataset for the IEEE 14-bus model contains 1000 scenarios with data for 28 continuous days in a 5minute interval. Each scenario includes pre-determined load variations and generation schedules which are representative of distributions of the French grid [7]. In this study only the first week of each scenario will be used.…”
Section: Power System Frameworkmentioning
confidence: 99%
“…We note that the formulation of the control problem considered here as a Markov Decision Process (MDP) can be found e.g. in [7], [12].…”
Section: Reinforcement Learning Approachmentioning
confidence: 99%
See 3 more Smart Citations