2019
DOI: 10.5957/jspd.04180010
|View full text |Cite
|
Sign up to set email alerts
|

Lean IHOP Transformation of Shipyard Erection Block Construction

Abstract: The modern system of shipbuilding includes applying integrated hull construction, outfitting and painting (IHOP) of ship interim products, as opposed to the traditional manner of first constructing the hull blocks, then performing basic outfitting and finally painting, all separate of each other. Even though most shipyards apply some degree of integration of all trades during vessel construction, much work could still be better integrated. This paper analyzes and maps the present IHOP construction of a typical… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…Value stream mapping methodology has been demonstrated to aid in improving panel assembly process [8,9], the built-up panel assembly process [10,11] and the large block erection process [12]. However, the purpose of this paper is to determine and demonstrate how the PWBS of two shipyards should be compared, and the one with the best system should be adopted by the other.…”
Section: Introductionmentioning
confidence: 99%
“…Value stream mapping methodology has been demonstrated to aid in improving panel assembly process [8,9], the built-up panel assembly process [10,11] and the large block erection process [12]. However, the purpose of this paper is to determine and demonstrate how the PWBS of two shipyards should be compared, and the one with the best system should be adopted by the other.…”
Section: Introductionmentioning
confidence: 99%