2017
DOI: 10.1016/j.proeng.2017.04.503
|View full text |Cite
|
Sign up to set email alerts
|

Large Structures Monitoring Using Unmanned Aerial Vehicles

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
14
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 20 publications
(14 citation statements)
references
References 3 publications
0
14
0
Order By: Relevance
“…The use of UAVs is most useful if they are capable of remotely monitoring a large structure. Chiu et al evaluated the use of UAVs for monitoring of large‐scale structures. The study used a remotely operated aerial vehicle for displacement measurement of a massive floating membrane spanning over 170 × 420 m in a wastewater treatment plant.…”
Section: Next‐generation Sensing Methodsmentioning
confidence: 99%
“…The use of UAVs is most useful if they are capable of remotely monitoring a large structure. Chiu et al evaluated the use of UAVs for monitoring of large‐scale structures. The study used a remotely operated aerial vehicle for displacement measurement of a massive floating membrane spanning over 170 × 420 m in a wastewater treatment plant.…”
Section: Next‐generation Sensing Methodsmentioning
confidence: 99%
“…Figure 3b shows the aligned tie-points profile of the covered anaerobic lagoon. The work presented is built on the previous works as described in [20,21], where the optimal flight parameters and aerial images photogrammetry setting were studied. A single grid flight path is chosen with image overlapping percentage set to be more than 70% in both forward and side direction.…”
Section: Unmanned Aerial Vehicle (Uav) Photogrammetry Set Upmentioning
confidence: 99%
“…The issues of radial distortion in 3D reconstruction (Wu [ 13 ]) is well documented. Indeed, our work preliminary work (Chiu et al [ 14 ]) was performed to adequately define the parameters required to avoid these issues (see also Li et al [ 15 ]). As reported in Chiu et al [ 14 ], the scanning of a large area (1881 m 2 ) took approximately 4 m. This provides an efficient means towards the development of a robust non-contact strain measurement strategy for large membrane.…”
Section: Approach To Monitoring Membrane Structuresmentioning
confidence: 99%
“…Indeed, our work preliminary work (Chiu et al [ 14 ]) was performed to adequately define the parameters required to avoid these issues (see also Li et al [ 15 ]). As reported in Chiu et al [ 14 ], the scanning of a large area (1881 m 2 ) took approximately 4 m. This provides an efficient means towards the development of a robust non-contact strain measurement strategy for large membrane. The ability of the photogrammetry methodology to define the details of an undulating terrain was presented by Chiu et al and is briefly described in this paper.…”
Section: Approach To Monitoring Membrane Structuresmentioning
confidence: 99%
See 1 more Smart Citation