2022
DOI: 10.1007/s10064-022-02733-9
|View full text |Cite
|
Sign up to set email alerts
|

Large-scale model test for studying the water inrush during tunnel excavation in fault

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
6
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 17 publications
(6 citation statements)
references
References 12 publications
0
6
0
Order By: Relevance
“…The model box [42] is shown in Figure 1; the internal net size of the model experiment box is 2:5 m × 1:0 m × 1:4 m (length × width × height). There are two tunnel openings of different sizes on the front and side of the model box.…”
Section: The Model Experiments Devicementioning
confidence: 99%
See 4 more Smart Citations
“…The model box [42] is shown in Figure 1; the internal net size of the model experiment box is 2:5 m × 1:0 m × 1:4 m (length × width × height). There are two tunnel openings of different sizes on the front and side of the model box.…”
Section: The Model Experiments Devicementioning
confidence: 99%
“…The artificial rainfall simulation system [42] is mainly composed of the rainfall device and the rainfall control system, as shown in Figures 2 and 3. In the rainfall control system, the appropriate rainfall intensity can be selected in the rain intensity selection areas according to the experiment requirements.…”
Section: The Model Experiments Devicementioning
confidence: 99%
See 3 more Smart Citations