2015
DOI: 10.1063/1.4931506
|View full text |Cite
|
Sign up to set email alerts
|

Large-scale and long-term CPV power plant field results

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
8
0

Year Published

2016
2016
2018
2018

Publication Types

Select...
3
1
1

Relationship

1
4

Authors

Journals

citations
Cited by 10 publications
(15 citation statements)
references
References 4 publications
1
8
0
Order By: Relevance
“…The early power plants with Concentrix technology were already installed and carefully monitored over the past years. It could be shown that availabilities over 98% and measured to predicted energies over 100% were achieved [5] indicating that no degradation could be observed. The 44 MW p power plant in Touwsrivier is an ideal case to provide insight in the reliability of this technology in the coming years.…”
Section: Power Plant Installation Acceptance and Operationmentioning
confidence: 86%
“…The early power plants with Concentrix technology were already installed and carefully monitored over the past years. It could be shown that availabilities over 98% and measured to predicted energies over 100% were achieved [5] indicating that no degradation could be observed. The 44 MW p power plant in Touwsrivier is an ideal case to provide insight in the reliability of this technology in the coming years.…”
Section: Power Plant Installation Acceptance and Operationmentioning
confidence: 86%
“…The qualification standard IEC 62108 so far gives good indication that systems perform well in the field if they have received the certification. 8 Solar Systems, 255 Soitec, 12,18,256 Semprius, 218 Suncore, 10 and ISFOC from the plants in Puertollano 8 and Daido Steel 67 have shown performance data from 2 to 8 yr with no degradation observed. FIG.…”
Section: E Long Term Stability-durabilitymentioning
confidence: 97%
“…There are other "CPV specific" losses due to temperature dependence of the SoG lens and changes in spectral conditions. 12,253 All these losses are anticipated and are included in the accurate prediction models. Including these losses with the utilization factor, prediction accuracy for AC power production of <2% for a CPV site has been reported.…”
Section: Prediction Of the Energy Yield And Assessment Of Plant Pementioning
confidence: 99%
See 2 more Smart Citations