Land Use Assessment of Economic Crops for Photovoltaic Power Plant in Phetchabun Province

Abstract: This research is aiming at the changing land use from agricultural land to photovoltaic power plant. Geographic information system (GIS) technology was used to indicate the unsuitable areas for five economic crops that are paddy, sugar cane, maize, cassava and para rubber. The assess cost, income, and CO2 emission of the economic crops and photovoltaic power plant are the major factors for the unsuitable agricultural land deciding that will be changed to build photovoltaic power plant. The results found that t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Because of the fertility of the land, Phetchabun has always been an agriculturally productive area. Phetchabun has an area of about 7,712,299 rais (12,339.68 km 2 ) and this study considers the land use on agricultural area only about 3,145,872 rais ( 5 Economics, 2013;Chada, 2013;Thanyalak and Kanlaya, 2014;Chiramakara and Thanarak, 2016). 2.…”
Section: Study Areamentioning
confidence: 99%
See 1 more Smart Citation
“…Because of the fertility of the land, Phetchabun has always been an agriculturally productive area. Phetchabun has an area of about 7,712,299 rais (12,339.68 km 2 ) and this study considers the land use on agricultural area only about 3,145,872 rais ( 5 Economics, 2013;Chada, 2013;Thanyalak and Kanlaya, 2014;Chiramakara and Thanarak, 2016). 2.…”
Section: Study Areamentioning
confidence: 99%
“…The areas of five economic crops were labeled as (S1), (S2), and (S3) for high, moderate and unsuitable respectively in terms of land suitability. (Thanyalak andKanlaya, 2014, Chiramakara andThanarak, 2016 (Puvadol and Supaporn, 2015) for photovoltaic power plant construction.…”
Section: Study Areamentioning
confidence: 99%