Laboratory Test Bed for Analyzing Fault-Detection Reaction Times of Protection Relays in Different Substation Topologies

Abstract: Visions of energy transition focus on activating end users, meaning that numerous flexible-distribution network-level devices become active participants in power-system operations. This implies a fast, reliable, and secure exchange of data, enabling the distribution-system operators to maintain, or even improve, the quality and delivery of service. With the introduction of the International Electrotechnical Commission (IEC) 61850 standard, the path is set for a single communication topology covering all substa… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
4
1

Relationship

0
10

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 21 publications
0
5
0
1
Order By: Relevance
“…For this reason, we have included in this section relevant resources dealing with the identification of security, operational, and service anomalies. Goran Jurišić, et al focused in their paper [3] on creating of testbed created for analysis of fault detection reaction times. In their approach, they use industrial protocol GOOSE to test the time of reactions.…”
Section: Current State-of-the-artmentioning
confidence: 99%
“…For this reason, we have included in this section relevant resources dealing with the identification of security, operational, and service anomalies. Goran Jurišić, et al focused in their paper [3] on creating of testbed created for analysis of fault detection reaction times. In their approach, they use industrial protocol GOOSE to test the time of reactions.…”
Section: Current State-of-the-artmentioning
confidence: 99%
“…The use of specific hardware setups combined with numerical simulations can be used to assess complex systems, using techniques known as hardware-in-the-loop simulation. As an example, due to the higher complexity of protection and communication systems of IEC 61850-9-2LE substations, in [26] is proposed the use of this simulation technique in a laboratory test bed for analyzing the performance of complex substation topologies that are prone to faults.…”
Section: Related Workmentioning
confidence: 99%
“…Dependendo da configuração programada do relé, a caixa de ensaio pode monitorar as saídas binárias ou os sinais de comunicação do equipamento testado. Todas as sequências de teste são gerenciadas e monitoradas pelo especialista em relés de proteção, tornando-as uma figura-chave em termos de testes periódicos de relés de proteção (JURISIC, et al, 2018).…”
Section: Introductionunclassified