2002
DOI: 10.1108/14714170210814685
|View full text |Cite
|
Sign up to set email alerts
|

Knowledge management in the architecture, engineering and construction industry

Abstract: Knowledge management (KM) is now recognized as a core business concern and intellectual assets play a vital role in gaining competitive advantage. Within the architecture, engineering and construction (AEC) industry, where the need for innovation and improved business performance requires the effective deployment and utilization of project knowledge, the need for strategic knowledge management is also being acknowledged. This paper reviews various initiatives for KM in order to assess the extent to which it is… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

3
91
0
9

Year Published

2005
2005
2018
2018

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 153 publications
(103 citation statements)
references
References 9 publications
3
91
0
9
Order By: Relevance
“…Integração projetoprodução MELHADO, 1999;MELHADO, 2001;FABRICIO, 2002;FONTENELLE, 2002;GRILO, 2002;ROMANO, 2003;MELHADO et al, 2005;TZORTZOPOULOS;COOPER, 2007;KOKKALA, 2009;SHEN et al, 2010 Transferência de conhecimento para criação de valor do projeto TIWANA, 2000 apud CARRILLO; CARRILLO; ANUMBA; KAMARA, 2000;GRILO, 2002;CARRILLO, CHINOWSKY, 2006;CHAKRAVARTHY;MCEVILE, 2007;OTTER;LÊ, BR∅NN, 2007;VAKILI-ARDEBILI;BOUSSABAINE, 2007;EMMITT, 2008;JEON, 2009;BAKKER et al, 2011 Comunicação e colaboração entre as equipes e o compartilhamento de conhecimento EMMITT, 2002;WALKER, 2005;SRINIVASAN, 2007;KOKKALA, 2009;SENARATNE;SEXTON, 2009;SUN;MENG, 2009;RATH, 2010;SHEN et al, 2010;REZGUI;HOFPE;VORAKULPIPAT, 2010 Estratégia de gestão do conhecimento e barreiras encontradas KAMARA; ANUMBA; BROWN, 2001;ROBINSON et al, 2001;KAMARA et al, 2002;CARRILLO et al, 2004;EGBU, 2004;CARRILLO;…”
Section: Temas Literaturaunclassified
See 4 more Smart Citations
“…Integração projetoprodução MELHADO, 1999;MELHADO, 2001;FABRICIO, 2002;FONTENELLE, 2002;GRILO, 2002;ROMANO, 2003;MELHADO et al, 2005;TZORTZOPOULOS;COOPER, 2007;KOKKALA, 2009;SHEN et al, 2010 Transferência de conhecimento para criação de valor do projeto TIWANA, 2000 apud CARRILLO; CARRILLO; ANUMBA; KAMARA, 2000;GRILO, 2002;CARRILLO, CHINOWSKY, 2006;CHAKRAVARTHY;MCEVILE, 2007;OTTER;LÊ, BR∅NN, 2007;VAKILI-ARDEBILI;BOUSSABAINE, 2007;EMMITT, 2008;JEON, 2009;BAKKER et al, 2011 Comunicação e colaboração entre as equipes e o compartilhamento de conhecimento EMMITT, 2002;WALKER, 2005;SRINIVASAN, 2007;KOKKALA, 2009;SENARATNE;SEXTON, 2009;SUN;MENG, 2009;RATH, 2010;SHEN et al, 2010;REZGUI;HOFPE;VORAKULPIPAT, 2010 Estratégia de gestão do conhecimento e barreiras encontradas KAMARA; ANUMBA; BROWN, 2001;ROBINSON et al, 2001;KAMARA et al, 2002;CARRILLO et al, 2004;EGBU, 2004;CARRILLO;…”
Section: Temas Literaturaunclassified
“…Souza (2001) aponta a importância da fase de preparação para execução das obras (PEO) onde os agentes envolvidos com o projeto e a execução do empreendimento (empreendedor, coordenador, projetistas, consultor de gestão de qualidade, construtora e fornecedores) teriam a oportunidade de estudar o projeto, planejar e otimizar a execução dos serviços, antecipando decisões e prevenindo os riscos de uma não-qualidade, além de evitar o conflito projeto-obra que compromete os resultados finais do empreendimento. Kamara et al (2002) apresentam um modelo simplificado do processo de construção, como mostra a Figura 9. Durante a fase de concepção do projeto, o cliente estabelece suas necessidades para o projeto e desenvolve uma lista de requisitos que são convertidos pela equipe de projetistas em desenhos, especificações, etc.…”
Section: Ciclo De Vida De Um Empreendimento E Do Processo De Projetounclassified
See 3 more Smart Citations