2012
DOI: 10.1016/j.ijproman.2011.12.003
|View full text |Cite
|
Sign up to set email alerts
|

Knowledge management and project-based knowledge in it projects: A model and preliminary empirical results

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
58
0
7

Year Published

2014
2014
2021
2021

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 104 publications
(66 citation statements)
references
References 70 publications
1
58
0
7
Order By: Relevance
“…Throughout the 21 st century, our view regarding knowledge management (KM) Thomas, (2013) has drastically changed (Reich et. al., 2012).…”
Section: Introductionmentioning
confidence: 99%
“…Throughout the 21 st century, our view regarding knowledge management (KM) Thomas, (2013) has drastically changed (Reich et. al., 2012).…”
Section: Introductionmentioning
confidence: 99%
“…Knowledge within the PBO can be considered within the context of the knowledge stock, enabling environment, and knowledge practices [21][22][23]. It is the responsibility of the organisation to create the KM-enabling environment and to implement and maintain the knowledge practices.…”
Section: (Mainly Explicit Knowledge)mentioning
confidence: 99%
“…Reich et al [21] propose that KM within the organisation should be investigated with regard to the knowledge about the organisation (procedural or know-how), knowledge about the business value (the market), and knowledge about the technology (know-what). This leads to value assurance of the knowledge for the organisation, and should be conducted by a centralised function within the PBO [21].…”
Section: (Mainly Explicit Knowledge)mentioning
confidence: 99%
See 1 more Smart Citation
“…In other studies, research on the automotive sector has highlighted how establishing communities of practice (i. e., working groups that have common interests) can help support project knowledge management (Johansson, Moehler, & Vahidi, 2013). Knowledge management for information technology projects may be considered as enabling the creation and alignment of three types of project-based knowledge that are needed to result in the desired business outcomes, which are technical design knowledge, organizational change knowledge and business value knowledge (Reich, Gemino, & Sauer, 2012). Adopting a broad or holistic view of the knowledge that is generated during a project as well as the knowledge requirements of engineering project is therefore a desirable objective.…”
Section: Literature Reviewmentioning
confidence: 99%