Key Performance Indicators Analysis for Quay Container Crane Performance Assessment (Case Study at Jakarta International Container Terminal)

Abstract: <p><span lang="PT-BR">PT Jakarta International Container Terminal (JICT) is the largest container port in Indonesia. Currently, JICT capacity is 2.5 million TEUs (Twenty-foot Equivalent Units) per year, it continues to strive to improve international services and is supported by adequate container loading and unloading equipment. The requirement to establish common standards in different types of container port equipment and identify performance indicators to assess the performance of container han… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 9 publications
0
5
0
Order By: Relevance
“…Since APA is a focus during operation, the delay time for logistic is neglected because the repair team is assumed to be in standby all the time during operation. The MTBF and MTTR are calculated as follows: 15 MTBF0.28embadbreak=Hours0.28emof0.28emequipment0.28emis0.28emoperationalFrequency0.28emof0.28embreakdown0.28emin0.28ema0.28emtime0.28emperiodgoodbreak=0.28emtoE$$\begin{equation}MTBF{\rm{\;}} = {\rm{\;\;}}\frac{{Hours{\rm{\;}}of{\rm{\;}}equipment{\rm{\;}}is{\rm{\;}}operational}}{{Frequency{\rm{\;}}of{\rm{\;}}breakdown{\rm{\;}}in{\rm{\;}}a{\rm{\;}}time{\rm{\;}}period}} = {\rm{\;}}\frac{{{t_o}}}{{\sum E}}\end{equation}$$ MTTR0.28embadbreak=Hours0.28emtaken0.28emto0.28emresolve0.28embreakdownFrequency0.28emof0.28embreakdown0.28emin0.28ema0.28emtime0.28emperiod0.28emgoodbreak=0.28emtbE$$\begin{equation}MTTR{\rm{\;}} = \frac{{Hours{\rm{\;}}taken{\rm{\;}}to{\rm{\;}}resolve{\rm{\;}}breakdown}}{{Frequency{\rm{\;}}of{\rm{\;}}breakdown{\rm{\;}}in{\rm{\;}}a{\rm{\;}}time{\rm{\;}}period}}{\rm{\;}} = {\rm{\;}}\frac{{{t_b}}}{{\sum E}}\end{equation}$$…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…Since APA is a focus during operation, the delay time for logistic is neglected because the repair team is assumed to be in standby all the time during operation. The MTBF and MTTR are calculated as follows: 15 MTBF0.28embadbreak=Hours0.28emof0.28emequipment0.28emis0.28emoperationalFrequency0.28emof0.28embreakdown0.28emin0.28ema0.28emtime0.28emperiodgoodbreak=0.28emtoE$$\begin{equation}MTBF{\rm{\;}} = {\rm{\;\;}}\frac{{Hours{\rm{\;}}of{\rm{\;}}equipment{\rm{\;}}is{\rm{\;}}operational}}{{Frequency{\rm{\;}}of{\rm{\;}}breakdown{\rm{\;}}in{\rm{\;}}a{\rm{\;}}time{\rm{\;}}period}} = {\rm{\;}}\frac{{{t_o}}}{{\sum E}}\end{equation}$$ MTTR0.28embadbreak=Hours0.28emtaken0.28emto0.28emresolve0.28embreakdownFrequency0.28emof0.28embreakdown0.28emin0.28ema0.28emtime0.28emperiod0.28emgoodbreak=0.28emtbE$$\begin{equation}MTTR{\rm{\;}} = \frac{{Hours{\rm{\;}}taken{\rm{\;}}to{\rm{\;}}resolve{\rm{\;}}breakdown}}{{Frequency{\rm{\;}}of{\rm{\;}}breakdown{\rm{\;}}in{\rm{\;}}a{\rm{\;}}time{\rm{\;}}period}}{\rm{\;}} = {\rm{\;}}\frac{{{t_b}}}{{\sum E}}\end{equation}$$…”
Section: Methodsmentioning
confidence: 99%
“…The breakdown frequency of the QC gradually increases over time under harsh conditions of heavy operation. 15 Besides other container port equipment such as rubber tyre gantry (RTG), straddle carrier and prime mover, quay crane plays an important role as vital port equipment.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…From the existing problems and the need to measure the company's performance, KPI is set as a measurement benchmark based on the strategic objectives of the company's BSC design (Setiawan & Farmansyah, 2016); (Pekih, I.M. ;Sembiring, A.;. SWOT Analysis (Strengths, Weaknesses, Opportunities, and Threats) Good strategic planning will lead the company to achieve advantages of competing with other companies, and having products that meet consumer expectations.…”
Section: Figure 2 Frameworkmentioning
confidence: 99%
“…To support container loading and unloading services, PT JICT has reliable and adequate equipment facilities: 14 units of QCC, 60 units of RTGC, 105 units of Yard Truck, 4 units of Reach Stacker & 6 units of Side Loader. JICT as a large company that wishes to continue to grow and sustain, must carefully consider various supporting factors in realizing the company's vision and mission and win business competition with the support of facilities and infrastructure owned by JICT [6].…”
Section: Introductionmentioning
confidence: 99%