Kamu Özel Sektör İşbirliği ile Yapılan Projelerdeki Kritik Başarı Faktörlerinin Çeşitleme İle İncelenmesi: Türkiye Perspektifi

Abstract: Long-term debt financing opportunities 0.883 Factor 10. Stable macroeconomic environment Strong economic policies 0.888 Table A. The most important critical success factors for each main factorPurpose:The purpose of this study is the identification of the critical success factors for the PPP projects performed in Turkey. Theory and Methods:This study is conducted by following a triangulation method. According to the triangulation method, two or more resources should be used to collect data about a subject, the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
1

Relationship

2
2

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 30 publications
0
4
0
Order By: Relevance
“…Due to the complexity of the BOT projects, a comprehensive technical feasibility study should be conducted. Otherwise, project delays, cost overruns and high maintenance and operation costs will become inevitable (Budayan, 2018). Moreover, comprehensive technical feasibility can enhance the internal value of the facility and prolong the facility's operation period (Zhang, 2006).…”
Section: Discussion Of Findingsmentioning
confidence: 99%
See 1 more Smart Citation
“…Due to the complexity of the BOT projects, a comprehensive technical feasibility study should be conducted. Otherwise, project delays, cost overruns and high maintenance and operation costs will become inevitable (Budayan, 2018). Moreover, comprehensive technical feasibility can enhance the internal value of the facility and prolong the facility's operation period (Zhang, 2006).…”
Section: Discussion Of Findingsmentioning
confidence: 99%
“…Consequently, the capability of the public sector in the evaluation of the bidders in terms of their technical knowledge and capability should be evaluated in this stage for performance measurement. Besides, a competitive tender procedure is an essential part of a PPP process to enhance value for money (Emek, 2015) because the bargaining power of the public can increase with an increasing number of bidders (Budayan, 2018). Especially in PPP markets, this is crucial because there is a small number of potential bidders that have sufficient technical and financial capabilities for conducting a megaproject.…”
Section: Ijmpb 136mentioning
confidence: 99%
“…Kusljic and Marenjak [45] also called one of the identified factors as project delivery in their study. Due to the complexity of PPP projects, these projects can confront many problems, such as project delays, cost overruns, and high maintenance and operation costs [59].…”
Section: Project Delivery (Factor 1)mentioning
confidence: 99%
“…In PPP projects, the private sector is the investor of the project, in other words, these companies must provide the required finance to complete these projects. Turkish construction companies have limited financial resources compared to construction companies in developed countries [59]. Therefore, they must obtain external finance from banks and other financial institutions.…”
Section: Project Delivery (Factor 1)mentioning
confidence: 99%