Abstract: As a result of full-scale surveys of parameters of open mining facilities, a set of discrete values is basically obtained. The geomechanical state of the ledges of the sides of the pit and dumps can not be fully represented without obtaining objective information about the dynamics of the deformation regime of the observed object. This information is necessary throughout the life of the quarry, in order to ensure its trouble-free operation. Thus, effective monitoring of the ledges of the sides of quarries and … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…The measurement results are presented by the same measurements as a serviceable bearing, this is done so that the signals and spectra can be compared with each other [21,22,24].…”
Section: Fig 3 Graphical Explanation Of the Kinematic Disturbance Fmentioning
confidence: 99%
“…The measurement results are presented by the same measurements as a serviceable bearing, this is done so that the signals and spectra can be compared with each other [21,22,24].…”
Section: Fig 3 Graphical Explanation Of the Kinematic Disturbance Fmentioning
confidence: 99%
“…By using the example of the energy industry, a comparative analysis of the existing methods for estimating R&D (regression analysis) and the method of foresight technologies is performed [24,25]. The evaluation of R&D projects in the context of long-term development of technologies was carried out.…”
Section: Meso-level Of Randd Projects (Programs Of Regions Sectors mentioning
confidence: 99%
“…Set of factors may have effect on the productivity and efficiency of production, the structure of production and its technological level, intensity of work and non-productive expenses of working hours are taken into account [1,2,12,17,19,22,26]. As an analysis of these enterprises of GAS industrial Group shows, untapped opportunities of improvement of these indicators are closely connected with the systematical losses, which were revealed during use of the equipment.…”
Section: Introductionmentioning