“…In recent years, joint optimization of well-placement and control problems have gained increasing interest to identify the optimal well locations and corresponding control scheme [50,51]. Traditional methods on such problems use a sequential way to determine the optimal development scheme which is easy to suffer from local optimum [52,53].…”