Jindong Bridge: Suspension Bridge with Steel Truss Girder and Prefabricated RC Deck Slabs in China

Abstract: The Jindong Bridge, crossing the Jinsha River in Yunan Province, China, is a suspension bridge with a main span of 730 m. In this paper, the design and construction of this bridge are introduced. Both tunnel-type and gravity-type anchorages were applied. For installations of main cable strands, the relative altitude difference method was used based on quantified interstrand distances to guarantee sufficient accuracy. In the erection of steel truss girder, segments were connected by temporary hinges. During the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 11 publications
(6 citation statements)
references
References 3 publications
0
6
0
Order By: Relevance
“…The analytical algorithm viability was proved by its application to the particular case, namely, the Jindong Bridge, which is a suspension bridge with the longest span across the Jinsha River in Yunnan Province of China (Zhang et al, 2018a). The bridge is spanned as 240 m + 730 m + 120 m, as seen in Figure 7.…”
Section: The Proposed Algorithm Application To a Particular Engineerimentioning
confidence: 99%
See 3 more Smart Citations
“…The analytical algorithm viability was proved by its application to the particular case, namely, the Jindong Bridge, which is a suspension bridge with the longest span across the Jinsha River in Yunnan Province of China (Zhang et al, 2018a). The bridge is spanned as 240 m + 730 m + 120 m, as seen in Figure 7.…”
Section: The Proposed Algorithm Application To a Particular Engineerimentioning
confidence: 99%
“…The bridge deck is made from 4.96 m-long, 1.70 m-wide, and 0.16 m-thick precast concrete slabs. The slab deck and longitudinal beams are fastened by shear pins (Zhang et al, 2018a).…”
Section: The Proposed Algorithm Application To a Particular Engineerimentioning
confidence: 99%
See 2 more Smart Citations
“…It is noteworthy that the proposed method and the respective calculation results were successfully Figure 9. Steel truss girder and bridge floor system (Zhang et al, 2018a). implemented in the design and construction of the Jindong Bridge, which ensured its improved cable geometry.…”
Section: Numerical Simulation Examplementioning
confidence: 99%