2011
DOI: 10.1016/j.fusengdes.2011.03.046
|View full text |Cite
|
Sign up to set email alerts
|

ITER Remote Maintenance System (IRMS) lifecycle management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2012
2012
2013
2013

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 2 publications
0
3
0
Order By: Relevance
“…The RHCA process is defined in [1] and [2]. For each design review an RHCA should be performed, resulting in a document set comprising:…”
Section: Remote Handling Compatibility Assessmentmentioning
confidence: 99%
See 1 more Smart Citation
“…The RHCA process is defined in [1] and [2]. For each design review an RHCA should be performed, resulting in a document set comprising:…”
Section: Remote Handling Compatibility Assessmentmentioning
confidence: 99%
“…The ITER remote handling (RH) section has procedures to come to validated RH designs and methods [1]. This implies that the accessibility and handle-ability of the overall system needs to be reviewed.…”
Section: Introductionmentioning
confidence: 99%
“…ITER has established procedures to develop validated RH designs and methods [1] [2]. This implies that the accessibility and handle-ability of an ITER component by remote methods, needs to be reviewed.…”
Section: Introductionmentioning
confidence: 99%