ITER and JT-60SA Conductor Production at ICAS

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
11
0

Year Published

2013
2013
2015
2015

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 14 publications
(14 citation statements)
references
References 5 publications
0
11
0
Order By: Relevance
“…The one in the US (located at HPM in Tallahassee, Florida) is the most particular as it runs parallel to the Tallahassee airport runway. Save for the facility in Europe, which is used for both ITER and JT60 super upgrade conductor productions [39], all the other lines have been set up and are operated for ITER.…”
Section: Iter Conductorsmentioning
confidence: 99%
“…The one in the US (located at HPM in Tallahassee, Florida) is the most particular as it runs parallel to the Tallahassee airport runway. Save for the facility in Europe, which is used for both ITER and JT60 super upgrade conductor productions [39], all the other lines have been set up and are operated for ITER.…”
Section: Iter Conductorsmentioning
confidence: 99%
“…An intense crash program has thus been launched by ITER IO in 2012, to optimize the conductor design, possibly maintaining unvaried conductor size and geometry. Following, once again, the indications given by mechanical computations [104,109], four different CS CICC samples have been manufactured during summer 2011 [110,111], with variations of cable parameters with respect to the reference design, in terms of twist pitch values, as outlined in table 1. A very STP sequence, proposed by ITER and never probed before and a long one (LTP) were considered, and the appearance of the different produced cables can be observed in figure 8.…”
Section: The Iter Cs Development Strategymentioning
confidence: 99%
“…The aim was to confirm the properties of cold rolled co-extruded Al-0.1wt%Ni on a production-scale, to determine the optimal area reduction, and to assess the workability by bi-directional rolling as function of the amount of passes. Work hardening was applied on a 50 ton DEM, actively driven, four-roll Turks-head mill at Criotec, Chivasso (I); an installation also used for the ITER cable-in-conduit conductor production [9,10]. Force was applied mainly in the short transverse direction (ST), while the wide transverse direction (TD) was constrained to preserve cable integrity and maintain a realistic aspect ratio (width/thickness).…”
Section: Materials and Experimental Methodsmentioning
confidence: 99%