2019
DOI: 10.1145/3306606
|View full text |Cite
|
Sign up to set email alerts
|

Isolation Modeling and Analysis Based on Mobility

Abstract: In a mobile system, mobility refers to a change in position of a mobile object with respect to time and its reference point, whereas isolation means the isolation relationship between mobile objects under some scheduling policies. Inspired by event-based formal models and the ambient calculus, we first propose the two types of special events, entering and exiting an ambient, as movement events to model and analyze mobility. Based on mobility, we then introduce the notion of the isolation of mobile objects for … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
2

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 44 publications
0
5
0
Order By: Relevance
“…As mentioned before, these existing work always investigates the scheduling problems based on traditional task scheduling, and the efforts hardly reason about scheduling. Based on more fine-grained event scheduling, Jiang et al [16] attempt to model and analyze isolation from the perspective of mobility, which is the most related to this work. However, their work focuses on fixed priority event scheduling and gener-ates a priority scheduling sequence by computing an execution sequence of a system, which do not consider event scheduling with a loop.…”
Section: Related Work On Schedulingmentioning
confidence: 99%
See 4 more Smart Citations
“…As mentioned before, these existing work always investigates the scheduling problems based on traditional task scheduling, and the efforts hardly reason about scheduling. Based on more fine-grained event scheduling, Jiang et al [16] attempt to model and analyze isolation from the perspective of mobility, which is the most related to this work. However, their work focuses on fixed priority event scheduling and gener-ates a priority scheduling sequence by computing an execution sequence of a system, which do not consider event scheduling with a loop.…”
Section: Related Work On Schedulingmentioning
confidence: 99%
“…The generated scheduling sequence may contain a loop. Thus this work is actually an extension of [16] aiming to solve the safety isolation problems in complex mobile systems, which is original and different from all these related work.…”
Section: Related Work On Schedulingmentioning
confidence: 99%
See 3 more Smart Citations