1997 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record
DOI: 10.1109/icps.1997.595996
|View full text |Cite
|
Sign up to set email alerts
|

Islanding tests near a mini hydro generating plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…When system becomes islanded the frequency of the system is severely disturbed resulting in high oscillation in system frequency. The operation of mini hydro power plant during islanding test is given in [7]. The intentional islanding tests are performed to check the reliability of system as discussed in [8]- [9].…”
Section: Introductionmentioning
confidence: 99%
“…When system becomes islanded the frequency of the system is severely disturbed resulting in high oscillation in system frequency. The operation of mini hydro power plant during islanding test is given in [7]. The intentional islanding tests are performed to check the reliability of system as discussed in [8]- [9].…”
Section: Introductionmentioning
confidence: 99%