1933
DOI: 10.1109/ee.1933.6430521
|View full text |Cite
|
Sign up to set email alerts
|

Investigation of rail impedances

Abstract: The cost of the grounding transformers and ground relays for the 6,900-volt distribution system would be about $12,000. The application to the telephone system of alternative safety measures considered would cost substantially in excess of the cost of the power system measures and does not appear justified in this case. Therefore, the cost of the telephone plant would be about the same in joint use with either power system.With the additional protective measures provided for the 6,900volt distribution system, … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2010
2010
2021
2021

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Compared with the Refs. [34,35], the resistive part result obtained from the ETC model based on the complex effective permeability is accurate, and the reactive part is a little small. When compared with the FEM, the result is shown in Fig.…”
Section: Comparison Of Using Fem and The Etc Model Based On Complex Effective Permeabilitymentioning
confidence: 87%
“…Compared with the Refs. [34,35], the resistive part result obtained from the ETC model based on the complex effective permeability is accurate, and the reactive part is a little small. When compared with the FEM, the result is shown in Fig.…”
Section: Comparison Of Using Fem and The Etc Model Based On Complex Effective Permeabilitymentioning
confidence: 87%