The electricity generated can be used for general purposes like street lights, traffic signals etc. Power generation can be improved by arranging these power humps in series, and this generated power can be amplified and stored using a battery using speed breaker. Cone maintenance cost is very low. With this arrangement, the demand can be reduced to some extent. This scheme takes power from the speed breaker by arranging the gear and using the battery. This can generate large amount of electricity and if implemented will be very beneficial for the government. The principle in this scheme is the conversion of electrical energy into potential energy.