2023
DOI: 10.3390/buildings13092219
|View full text |Cite
|
Sign up to set email alerts
|

Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA

Reda Abdelshafy Abougamil,
David Thorpe,
Amirhossein Heravi

Abstract: The construction industry in the Kingdom of Saudi Arabia (KSA) is a significant sector in the Middle East, with annual expenditures surpassing USD 120 billion. It employs approximately 15% of the workforce and consumes more than 14% of the country’s energy resources. However, the Saudi construction sector encounters numerous challenges, including a deficiency in skilled labor, escalating costs, disputes, and material shortages. This study aims to investigate the origins of construction disputes in KSA and emph… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(9 citation statements)
references
References 58 publications
0
9
0
Order By: Relevance
“…Associated risks might be extended to the lifecycle of the project after the construction stage and during the operation phase, when there is a lack of implementation of a building management system based on BIM. Research in the Iranian construction industry focused on the importance of examining risks and their interconnections for the effective implementation of Energy Performance Contracting (EPC) projects in developing countries with significant energy usage [53]. The use of hybrid method techniques has generated a valuable network relation map, providing insights into the interconnections among various risk dimensions and determinants.…”
Section: Associated Risks With Bim Applicationmentioning
confidence: 99%
See 4 more Smart Citations
“…Associated risks might be extended to the lifecycle of the project after the construction stage and during the operation phase, when there is a lack of implementation of a building management system based on BIM. Research in the Iranian construction industry focused on the importance of examining risks and their interconnections for the effective implementation of Energy Performance Contracting (EPC) projects in developing countries with significant energy usage [53]. The use of hybrid method techniques has generated a valuable network relation map, providing insights into the interconnections among various risk dimensions and determinants.…”
Section: Associated Risks With Bim Applicationmentioning
confidence: 99%
“…The use of hybrid method techniques has generated a valuable network relation map, providing insights into the interconnections among various risk dimensions and determinants. The project lifecycle risks are closely linked to other risks, either causally or consequentially [53]. This highlights the need for efficient risk management solutions, specifically for hazards and risks throughout the project lifecycle.…”
Section: Associated Risks With Bim Applicationmentioning
confidence: 99%
See 3 more Smart Citations