Introduction and Commissioning of the New Darmstadt Transonic Compressor Test Facility

Abstract: With the well-known Transonic Compressor Darmstadt (TCD) in operation since 1994, profound knowledge in designing and operating a sophisticated test-rig is available at the Institute of Gas Turbines and Aerospace Propulsion of TU Darmstadt. During this period, TCD has been subject to a vast number of redesigns within different measurement campaigns (see [1], [2], [3], [4], [5], [6], [7], [8]). To expand the capabilities and ensure a sustainable process of compressor research, a new test facility was designed a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
3

Relationship

2
5

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Safe operation and continuous monitoring of the rotor in the presence of distorted inflow is ensured by a total of 16 strain gauges applied on the rotor blades, as well as a tip timing system that is also used to monitor tip clearance. More information about the rig and the measurement systems is given by Kunkel et al (2019), and the traversable instrumentation is described in further detail by Werner et al (2022).…”
Section: Methodsmentioning
confidence: 99%
“…Safe operation and continuous monitoring of the rotor in the presence of distorted inflow is ensured by a total of 16 strain gauges applied on the rotor blades, as well as a tip timing system that is also used to monitor tip clearance. More information about the rig and the measurement systems is given by Kunkel et al (2019), and the traversable instrumentation is described in further detail by Werner et al (2022).…”
Section: Methodsmentioning
confidence: 99%
“…During the first measurement campaign comprehensive measurements were conducted, including steady-state and transient tests as well as multiple maneuvers beyond the stability limit. A detailed overview concerning test rig capabilities, performance and instrumentation as well as results of steady data analyses was elaborated by Kunkel et al (2019).…”
Section: Methodsmentioning
confidence: 99%
“…). Based on years of experience, also a second state-of-the-art transonic compressor test facility (Kunkel et al (2019)) has been developed and commissioned.…”
Section: Introductionmentioning
confidence: 99%