2014
DOI: 10.12988/ams.2014.411945
|View full text |Cite
|
Sign up to set email alerts
|

Intra prediction header bits estimation algorithm for RDO in H.265/HEVC

Abstract: The amount of video information to store and transmit is continuously increasing. The new video compression standard H.265/HEVC provides the ability to halve video bitrate at the cost of higher computational expenses. The most time-demanding part of a compression system is decision making, especially when based on rate-distortion optimization (RDO). There are a lot of papers that tend to decrease the complexity of decision making by either reducing the number of coding options to compare or by reducing the com… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2015
2015

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…Those modes are a part of the most probable modes (MPM) list that additionally includes some modes that are considered the most probable for the current PU [10]. Coding of MPM takes less bits than coding of non MPM [11], which means that potentially MPM may have least RD cost . The results in Table 2 show that this approach provides 2.60% bitrate overhead on average and 5.98% at maximum.…”
Section: Modified Fast Intra Prediction Searchmentioning
confidence: 99%
“…Those modes are a part of the most probable modes (MPM) list that additionally includes some modes that are considered the most probable for the current PU [10]. Coding of MPM takes less bits than coding of non MPM [11], which means that potentially MPM may have least RD cost . The results in Table 2 show that this approach provides 2.60% bitrate overhead on average and 5.98% at maximum.…”
Section: Modified Fast Intra Prediction Searchmentioning
confidence: 99%
“…While the total bit rate overhead is 1.54%, the prediction header estimation errors provide 0.09% overhead [22], while the rest is provided by the residuals estimation errors.…”
Section: Dmentioning
confidence: 99%