2018
DOI: 10.1016/j.autcon.2017.10.018
|View full text |Cite
|
Sign up to set email alerts
|

Interoperability specification development for integrated BIM use in performance based design

Abstract: Interoperability in BIM is low and the focus is on 3D coordination. Despite the available standards including IFC and IDM, there is still no clear guidance how such standards can be effectively used for performance based design. Thus, early collaboration is discouraged and performance analysis is conducted as late as possible to minimize the number of information exchanges, leading to difficulties and costly changes in design that is almost completed. Aim is to propose an interoperability specification develop… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
57
0
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 99 publications
(63 citation statements)
references
References 19 publications
0
57
0
1
Order By: Relevance
“…Previous research has emphasized underlying constraints in the process of BIM implementation. For example, to improve the interoperability performance in BIM, Arayici proposed a specific approach to help develop BIM execution in construction projects [27]. In order to establish a review analysis on critical success factors, Antwi-Afari (2018) conducted a comprehensive review on study of CSFs for BIM implementation and provided valuable reference for future research [28].…”
Section: Constraints In Application Of Building Information Modelingmentioning
confidence: 99%
“…Previous research has emphasized underlying constraints in the process of BIM implementation. For example, to improve the interoperability performance in BIM, Arayici proposed a specific approach to help develop BIM execution in construction projects [27]. In order to establish a review analysis on critical success factors, Antwi-Afari (2018) conducted a comprehensive review on study of CSFs for BIM implementation and provided valuable reference for future research [28].…”
Section: Constraints In Application Of Building Information Modelingmentioning
confidence: 99%
“…A BIM-based performance optimisation framework was developed in [63]. The use of open standards to enhance interoperability for performance-based design was proposed in [64]. An IFC-based framework for use of BIM to perform energy performance management analysis was developed in [65].…”
Section: Bim In Building Performancementioning
confidence: 99%
“…The simulation value has the same trend as the field monitoring value, as shown in Figure 13. At the beginning (stage [13][14][15][16][17][18][19][20][21][22][23][24], with the excavation at point A (stage 13), the settlement of the arch at point A in Z direction changes more rapidly, which is caused by the disturbance of lining structures when excavation. Then, with the continuous excavation (25-36 stages), the disturbance of point A in the subsequent excavation process decreases gradually, and the settlement of point A in Z direction tends to be stable.…”
Section: Fig 13 -Comparison Of Simulation Value and Monitoring Valuementioning
confidence: 99%
“…Presently, the research of BIM mainly focuses on theory, functional application, result analysis, etc., but lack of further research on the modeling process [14][15][16]. BIM modeling is a timeconsuming process in a project, which directly determines the efficiency of the project design [17][18][19].…”
Section: Introductionmentioning
confidence: 99%