Pipelines 2011 2011
DOI: 10.1061/41187(420)37
|View full text |Cite
|
Sign up to set email alerts
|

Internal PCCP Force Main Deterioration—Analysis and Rehabilitation

Abstract: and was constructed in 1979. The nominal inside diameter is 1350 mm (54") and the pipeline was designed as a sewage force main. In 1999, approximately 75 m (246 feet) of the pipe failed and was replaced with HDPE pipe. In 2008, an internal inspection was conducted downstream of the failed section. The inspection was conducted using man entry and by close circuit television (CCTV). The inspection found five (5) pipe sections under severe corrosion attack where the interior concrete surfaces near the crown of th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 7 publications
(5 reference statements)
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?