Interaction between project management processes: a social network analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Strategic Misrepresentation e.g., Underestimating cost [3,6,30,32,[95][96][97][98] escalating commitment [30,99] Pre-election commitments [53] Ministerial interference [92] Direct political influences [91,100] Project actors underestimating cost [27,32,40,53,97,101] Selecting politically aligned contractors [100,102] Political business cycles (Election cycles) [93] Governance shortfall in the organisation [103][104][105] Contract Poorly designed (intentionally) [50,54] Selection of political aligned PM team [106] Project actors overestimating benefits [32,97] Inappropriate Government Policies [107, 108]…”
Section: Cost Overrun Factors (Crfs) Authors Referencementioning
confidence: 99%
“…Strategic Misrepresentation e.g., Underestimating cost [3,6,30,32,[95][96][97][98] escalating commitment [30,99] Pre-election commitments [53] Ministerial interference [92] Direct political influences [91,100] Project actors underestimating cost [27,32,40,53,97,101] Selecting politically aligned contractors [100,102] Political business cycles (Election cycles) [93] Governance shortfall in the organisation [103][104][105] Contract Poorly designed (intentionally) [50,54] Selection of political aligned PM team [106] Project actors overestimating benefits [32,97] Inappropriate Government Policies [107, 108]…”
Section: Cost Overrun Factors (Crfs) Authors Referencementioning
confidence: 99%
“…Nodes are points where information entry or exits, and edges are the links between two nodes representing the information flow. Nodes and edges allow the development of a graph to be analyzed through metrics (Herrera et al 2020). These metrics are detailed in Table 1 and Table 2.…”
Section: Proceedings Of the 5thmentioning
confidence: 99%
“…This technique has been widely applied and used as a tool for organizations to understand its complexity and systems, identify knowledge leaders in organizations, measure collaboration of teams, the pattern of changes, structure and interactions (Daim et al 2016;Pan et al 2017). In the project management field, NA has been applied to understand the integration level of PMBOK processes through modelling its structure: input, tools, techniques and outputs (Herrera et al 2020). This article takes this work as a basis for studying the level of integration between the components of the Star Model.…”
Section: Introductionmentioning
confidence: 99%