2018
DOI: 10.17580/gzh.2018.01.05
|View full text |Cite
|
Sign up to set email alerts
|

Intelligent systems and technology in open pit coal mining with high overburden benches

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Improvement quality of crushing of the rock is due to increase of operation time explosion of the solid in presence broken-down rock of collapsed rocks. It generally provides the reduction of the negative impact in mining operations to the environment with reducing the number and volume dust and gases and other emissions [23]. It has been proved by the researches that the timely transition to open mining operations by high benches in the period of maximum development of mining operations, provides the increase in the final depth of the quarry and the increment of additional reserves without beating the open pit sides with the current ratio of overburden to economic stripping ratio being equal.…”
Section: Resultsmentioning
confidence: 99%
“…Improvement quality of crushing of the rock is due to increase of operation time explosion of the solid in presence broken-down rock of collapsed rocks. It generally provides the reduction of the negative impact in mining operations to the environment with reducing the number and volume dust and gases and other emissions [23]. It has been proved by the researches that the timely transition to open mining operations by high benches in the period of maximum development of mining operations, provides the increase in the final depth of the quarry and the increment of additional reserves without beating the open pit sides with the current ratio of overburden to economic stripping ratio being equal.…”
Section: Resultsmentioning
confidence: 99%
“…When stripping a high (h = 30 and 32 m) bench in two layers (at the same time), the excavator located in the upper layer must work ahead of the excavator operating in the lower layer. The speed of excavation work in the upper and lower layers along the front of mining operations should be the same [14][15]. Layer by layer high bench stripping according to the stripping system with overburden transport can be realized with the help of various technical means and technological schemes for conducting excavation and loading operations.…”
Section: Technology Of the Efficient Transition To High Bench Strippimentioning
confidence: 99%