2015
DOI: 10.1016/j.ejor.2015.05.039
|View full text |Cite
|
Sign up to set email alerts
|

Integration of selecting and scheduling urban road construction projects as a time-dependent discrete network design problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
23
0
2

Year Published

2016
2016
2023
2023

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 45 publications
(25 citation statements)
references
References 22 publications
0
23
0
2
Order By: Relevance
“…Some researchers have investigated the effectiveness of AV dedicated lanes using a bi-level framework. The concept of a bi-level framework has been applied to several problems in the context of transportation systems (Hosseininasab and Shetab-Boushehri, 2015;Gong and Fan, 2016;Hosseininasab et al, 2018;Miralinaghi et al, 2019bMiralinaghi et al, , 2020a. In their framework, the metropolitan authority at the upper level decides on the optimal plan for AV dedicated lanes based on the travel decisions of travelers at the lower level.…”
Section: Lane Management For Avsmentioning
confidence: 99%
“…Some researchers have investigated the effectiveness of AV dedicated lanes using a bi-level framework. The concept of a bi-level framework has been applied to several problems in the context of transportation systems (Hosseininasab and Shetab-Boushehri, 2015;Gong and Fan, 2016;Hosseininasab et al, 2018;Miralinaghi et al, 2019bMiralinaghi et al, , 2020a. In their framework, the metropolitan authority at the upper level decides on the optimal plan for AV dedicated lanes based on the travel decisions of travelers at the lower level.…”
Section: Lane Management For Avsmentioning
confidence: 99%
“…Time dimension was also introduced in other studies. For instance, Kim et al [48] formulated a time-dependent DNDP framework to address the project scheduling problem; Ukkusuri and Patil [49] developed a multiperiod flexible network design model with demand uncertainty and demand elasticity; Hosseininasab and Shetab-Boushehri [50] integrated project selection and scheduling into a single time-dependent DNDP model.…”
Section: Time-dependent Network Designmentioning
confidence: 99%
“…Conventionally, DNDP is employed to optimize the topology of a traffic network [28,[34][35][36]. It can be used to describe the problem whether to add a new link or whether to expand the capacity of existing links in the network.…”
Section: Introductionmentioning
confidence: 99%