2018
DOI: 10.1088/1757-899x/342/1/012005
|View full text |Cite
|
Sign up to set email alerts
|

Integration of Mahalanobis-Taguchi system and traditional cost accounting for remanufacturing crankshaft

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
2
2
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…Abu et al [32] identified the critical and non-critical variables during the remanufacturing process using MTS and simultaneously estimated the cost using the ABC method. Abu et al [33] evaluated the criticality of parameters on the end-of-life crankshaft based on Taguchi's orthogonal array. Then, [13] estimate the cost using traditional cost accounting by considering the critical parameters.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Abu et al [32] identified the critical and non-critical variables during the remanufacturing process using MTS and simultaneously estimated the cost using the ABC method. Abu et al [33] evaluated the criticality of parameters on the end-of-life crankshaft based on Taguchi's orthogonal array. Then, [13] estimate the cost using traditional cost accounting by considering the critical parameters.…”
Section: Literature Reviewmentioning
confidence: 99%