Integration of Cost and Work Breakdown Structures in the Management of Construction Projects

Abstract: Scope management allows project managers to react when a project underperforms regarding schedule, budget, and/or quality at the execution stage. Scope management can also minimize project changes and budget omissions, as well as improve the accuracy of project cost estimates and risk responses. For scope management to be effective, though, it needs to rely on a robust work breakdown structure (WBS). A robust WBS hierarchically and faithfully reflects all project tasks and work packages so that projects are ea… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
20
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 36 publications
(33 citation statements)
references
References 107 publications
1
20
0
Order By: Relevance
“…The work packaging model (WPM) is the most comprehensive way to integrate cost and schedule data as it eliminates the need for a cost breakdown structure (CBS) and adds cost data to the WBS (CHO; RUSSELL; CHOI, 2013). The integration of the CBS and the WBS allows the construction of a matrix to map the progress of activities and the location of each element of the project (CEREZO-NARVÁEZ et al, 2020). This unified hierarchy of data storage, universal for each specialist, allows the specifics of each section of the project to be taken into account, thus resulting in the storage of structured data with less inconsistency and duplication of information (HONCHARENKO et al, 2020).…”
Section: Integrated 3d Modeling Cost Estimation and Scheduling Information Workflow With Bimmentioning
confidence: 99%
See 2 more Smart Citations
“…The work packaging model (WPM) is the most comprehensive way to integrate cost and schedule data as it eliminates the need for a cost breakdown structure (CBS) and adds cost data to the WBS (CHO; RUSSELL; CHOI, 2013). The integration of the CBS and the WBS allows the construction of a matrix to map the progress of activities and the location of each element of the project (CEREZO-NARVÁEZ et al, 2020). This unified hierarchy of data storage, universal for each specialist, allows the specifics of each section of the project to be taken into account, thus resulting in the storage of structured data with less inconsistency and duplication of information (HONCHARENKO et al, 2020).…”
Section: Integrated 3d Modeling Cost Estimation and Scheduling Information Workflow With Bimmentioning
confidence: 99%
“…A critical problem in today's 3D BIM models is the discrepancy between the analytical structure of the element and the WBS of the project schedule (CEREZO-NARVÁEZ et al, 2020). Despite the BIM 4D capability to facilitate the team's generation of information, such as start and end dates of the elements and their criticality and visualization of the construction project over time (UMAR et al, 2015), the simulation requires multidisciplinary contributions, a significant project scope, and schedule information so project participants can develop and refine the modeling process (FISCHER et al, 2005;ISIKDAG;UNDERWOOD, 2010).…”
Section: Integrated 3d Modeling Cost Estimation and Scheduling Information Workflow With Bimmentioning
confidence: 99%
See 1 more Smart Citation
“…Content may change prior to final publication. [34] Cumulative Flow Diagram with some metrics [35] EVM & CPM [36] EVM & Use Case Point [37] EVM & WBS [38] CBS & WBS [39] Control Chart & EVM [40] level or at the product level. To measure the progress with multiple releases, the author identified each release (using sprint) in the project backlog and estimated the performance of the project at the end of each sprint when actual sprint velocity and actual costs are known [27].…”
Section: A Project Performance Measurement Techniquesmentioning
confidence: 99%
“…Although, WBS is used for time and CBS (Cost Breakdown Structure) is used for budget of the project. jointly they are used to increase the performance of the project [39]. However, WBS uses deliverable information and limited to incorporating the volatile nature of scope as requirements could not certainly belong to WBS.…”
Section: A Project Performance Measurement Techniquesmentioning
confidence: 99%