2017
DOI: 10.1016/j.jobe.2017.10.005
|View full text |Cite
|
Sign up to set email alerts
|

Integration of BIM and LCA: Evaluating the environmental impacts of building materials at an early stage of designing a typical office building

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
77
0
3

Year Published

2018
2018
2022
2022

Publication Types

Select...
4
4
1

Relationship

0
9

Authors

Journals

citations
Cited by 185 publications
(81 citation statements)
references
References 42 publications
1
77
0
3
Order By: Relevance
“…At present, sustainable construction faces many challenges globally, including the incompetence of complete life-cycle data arrangement and conducting data analysis to share with project participants [37]. BIM can store and manage building project data on energy consumption and offer detailed work-flow data during construction operation [38]. Thus, users can easily upload, extract, check, or transform information by using the BIM platform [39].…”
Section: Bim In Sustainable Constructionmentioning
confidence: 99%
“…At present, sustainable construction faces many challenges globally, including the incompetence of complete life-cycle data arrangement and conducting data analysis to share with project participants [37]. BIM can store and manage building project data on energy consumption and offer detailed work-flow data during construction operation [38]. Thus, users can easily upload, extract, check, or transform information by using the BIM platform [39].…”
Section: Bim In Sustainable Constructionmentioning
confidence: 99%
“…Hoxha et al [6] discussed on how to address data uncertainties through contribution and sensitivity analysis and draws attention to the implications for LCA. At the same time, Najjar et al [38] highlighted several gaps, such as incomplete databases or insufficient data at the early design phases that reduce the potential for LCA applications. Most studies present simplified hypotheses due to lack of incoming data, especially for EOL scenarios in which "only demolition and disposal to landfill sites will be considered" [39].…”
Section: Lca Iso Standards and Limitsmentioning
confidence: 99%
“…However, most BIM-based LCA methods papers do not precise the LOD for the LCA [25,56]. To achieve reuse, we should provide and integrate necessary BIM-attached information to simulate the assembly and disassembly process, such as a deconstruction plan [57], material properties enabling LCA performing [38]. Indeed, LCA requires rigor and comprehensive data obtained at an advanced stage of the project, whereas engineers need a simplified LCA in the early stages when we can still change the design choices influencing the environmental impact with a low LOD in the BIM model.…”
Section: Bim and Lca Integrationmentioning
confidence: 99%
“…The study [7] evaluates the relevance of each life cycle stage in relation to the overall environmental and economic impact on residential building energy refurbishment projects. Another study [8] once again integrates building information modeling (BIM) with life cycle assessment (LCA) and presents the outcome of multi-storey office building in evaluating environmental impacts of building materials. Most of the negative environmental impacts are occurring during the manufacturing and operation phases.…”
Section: Introductionmentioning
confidence: 99%