2010
DOI: 10.1007/s10489-010-0215-6
|View full text |Cite
|
Sign up to set email alerts
|

Integrating rush orders into existent schedules for a complex job shop problem

Abstract: This paper investigates the problem of inserting new rush orders into a current schedule of a real world job shop floor. Effective rescheduling methods must achieve reasonable levels of performance, measured according to a certain cost function, while preserving the stability of the shop floor, i.e. introducing as few changes as possible to the current schedule. This paper proposes new and effective match-up strategies which modify only a part of the schedule in order to accommodate the arriving jobs. The prop… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2010
2010
2020
2020

Publication Types

Select...
2
2
1

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 30 publications
0
4
0
Order By: Relevance
“…Some verification and repair of the solution may be necessary. For instance, right-shi f ting policy [40] can be used when operations overlaps appear after the integration. As shown in Fig.…”
Section: Jobsmentioning
confidence: 99%
See 2 more Smart Citations
“…Some verification and repair of the solution may be necessary. For instance, right-shi f ting policy [40] can be used when operations overlaps appear after the integration. As shown in Fig.…”
Section: Jobsmentioning
confidence: 99%
“…Unfortunately, the stability of the initial schedule cannot be guaranteed in this strategy. In fact, only a part of the initial schedule should be modified sometimes, which is the main idea of match-up strategy [40]. Match-up strategy is regarded as an effective rescheduling strategy to handle real time events [20].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…(Lei, 2010;Moratori et al, 2010) studied the scheduling problem under time constraints, attempting to minimize early and overdue deliveries." (Chung et al, 2009;Gholami and Zandieh, 2009;Behnamian et al, 2010) optimized schedules with respect to processing time and the starting time of production.…”
Section: Introductionmentioning
confidence: 99%