2009
DOI: 10.1016/j.envsoft.2009.04.005
|View full text |Cite
|
Sign up to set email alerts
|

Integrating case-based and fuzzy reasoning to qualitatively predict risk in an environmental impact assessment review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
19
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 43 publications
(19 citation statements)
references
References 36 publications
0
19
0
Order By: Relevance
“…This technique combines measures of attribute importance and performance into a two-dimensional grid as shown in Liu and Yu (2009). The grid is divided into four quadrants, where the y-axis depicts the importance and x-axis depicts the performance.…”
Section: Risk Management By Using Importance-performance Analysismentioning
confidence: 99%
“…This technique combines measures of attribute importance and performance into a two-dimensional grid as shown in Liu and Yu (2009). The grid is divided into four quadrants, where the y-axis depicts the importance and x-axis depicts the performance.…”
Section: Risk Management By Using Importance-performance Analysismentioning
confidence: 99%
“…For example in [12] the problem of environmental risk assessment is approached by a threefold solution: the use of case-based reasoning (CBR) for retrieval of similar cases, fuzzy reasoning (FR) for qualitative risk forecast, and importance-performance analysis (IPA) for risk management. The empirical evaluation on a real world case study highlights how a proper case base is crucial for this purpose.…”
Section: Related Workmentioning
confidence: 99%
“…In order to improve the efficiency of programming and design, the frame of fuzzy reasoning system has been structured [7]. The module calling format is used in the handle processing of the curve.…”
Section: Operation Of the Fuzzy Inferencementioning
confidence: 99%
“…Uj =(AxB)oP (8) Here, the gravity method is used to defuzzify the exact output and convert to a circular arc or a straight line to express curve [6][7].…”
Section: If R=ps and N=ps Then U=arb If R=pb And N=pb Then U= Arementioning
confidence: 99%