2015
DOI: 10.1007/s00170-015-7343-4
|View full text |Cite
|
Sign up to set email alerts
|

Integrated tasks assignment and routing for the estimation of the optimal number of AGVS

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
34
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 60 publications
(34 citation statements)
references
References 23 publications
0
34
0
Order By: Relevance
“…By encounter the AGV control problems, the system gaining in completed the transportation demand in a fast way with conflict-free among AGVs. Researchers have given significant attention in studying various AGV related problems, which are task assignment problem, vehicle dispatching problem and vehicle scheduling routing [3] ; [1] ; [8]; [9]; [16]; [14]; [5]. Most of the AGV related problems focusing on the performance of implement system compare with the conventional method and the majority of them are for multicapacity AGV.…”
Section: Problem Backgroundmentioning
confidence: 99%
See 1 more Smart Citation
“…By encounter the AGV control problems, the system gaining in completed the transportation demand in a fast way with conflict-free among AGVs. Researchers have given significant attention in studying various AGV related problems, which are task assignment problem, vehicle dispatching problem and vehicle scheduling routing [3] ; [1] ; [8]; [9]; [16]; [14]; [5]. Most of the AGV related problems focusing on the performance of implement system compare with the conventional method and the majority of them are for multicapacity AGV.…”
Section: Problem Backgroundmentioning
confidence: 99%
“…They are important to determine the aspects of the AGV system implementation, which are the efficiency of task schedule and routing system of transportation in order to minimize the time movement and avoiding deadlock and collision. Another aspect is the estimation of AGV quantity, required for the tasks assignment [16]. Furthermore, [13] proposed a modified GA to determine the optimal solutions with an acceptable solution of times.…”
Section: Problem Backgroundmentioning
confidence: 99%
“…Mousavi et al proposed an optimal scheduling model for AGVs that the objectives of which are the minimization of the makespan and number of AGVs while considering the AGVs battery charge; two optimization algorithms were also developed in the model [15,16]. Vivaldini et al presented a methodology for the estimation of the minimum number of AGVs required to execute a given transportation order within a specific time-window [33]. With the development of green manufacturing, studies have been done for a green workshop by considering the energy consumption of the machines, which is also an important running Sustainability 2019, 11, 1329 3 of 24 cost [34][35][36].…”
Section: Introductionmentioning
confidence: 99%
“…The applications of AGV systems face several important issues: AGVs number determining [2527], path planning [2830] and constraint exerting [3133], etc.…”
Section: Introductionmentioning
confidence: 99%