“…), with the planting of shrub species suitable for the riparian environment or through the hydroseeding techniques; the creation of scrapers and the positioning of triangular boulders deflectors in the riverbed; the construction of four ecotonal buffers, of which two adjoining the water course, with a width of not less than 10 meters and a coverage area of 24,000 m 2 ; the creation of three storage areas (areas A and C, 20,000 and 3,500 m 2 respectively, in the municipality of Cormano, the first one on the hydrographic right, the second one on the hydrographic left and area B, 18,000 m 2 , in the municipality of Bresso) and the de-sealing of four car parking areas for a total of 13,000 m 2 . In [1], the recalculation of the IFF index has shown the enhancement of the river ecologic role while the reduction of the floodable areas obtained after the implementation of storage areas on the Seveso river floodplain was addressed with a 16%, 13% and 26% reduction for 10, 100 and 500 years return period respectively compared to the current situation.…”