2010
DOI: 10.1061/(asce)cp.1943-5487.0000061
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Simulation System for Construction Operation and Project Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
24
0
1

Year Published

2011
2011
2021
2021

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 39 publications
(26 citation statements)
references
References 41 publications
0
24
0
1
Order By: Relevance
“…However, a set of simulated activity duration data, which can be generated by simulating operation models using discrete event simulation systems, can be used as the historical activity duration data. In this study, as in another similar study (Lee et al 2012), a system called Construction Operation and Project Scheduling (Lee et al 2010) was used to generate the fictitious data. • Step 4: The means of all activities' durations are computed.…”
Section: Methodsmentioning
confidence: 99%
“…However, a set of simulated activity duration data, which can be generated by simulating operation models using discrete event simulation systems, can be used as the historical activity duration data. In this study, as in another similar study (Lee et al 2012), a system called Construction Operation and Project Scheduling (Lee et al 2010) was used to generate the fictitious data. • Step 4: The means of all activities' durations are computed.…”
Section: Methodsmentioning
confidence: 99%
“…A common approach adopted in the literature to account for uncertainty and project-specific conditions in planning and analysis is discrete-event simulation (DES). DES has been used widely in previous studies to experiment with different construction processes [144][145][146][147][148][149]. Furthermore, DES has been used in several studies to estimate the carbon emissions of a number of construction operations including earthmoving [107,138,150], asphalt paving operation [151], tower crane swing operation [152] and highway construction projects [134].…”
Section: Accounting For Uncertainty and Site-specific Conditionsmentioning
confidence: 99%
“…The simulation tool represents a network constituting information of circulated work. Since CYCLONE is an efficient technique to predict the productivity and the construction period of a project based on construction type [46][47][48], productivity of the developed method and the productivity of the existing external insulation wet construction are compared using the corresponding management tools, thereby verifying and the applicability of the developed PC-Wall method.…”
Section: Productivity Analysismentioning
confidence: 99%