2024
DOI: 10.1109/tits.2023.3295812
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Scheduling of Yard and Rail Container Handling Equipment and Internal Trucks in a Multimodal Port

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 32 publications
0
0
0
Order By: Relevance
“…They verified the model's feasibility using the Gurobi solver. Liu et al [23] investigated the coscheduling problem involving railroad gantry cranes (RCOGC), YC, and IV in an intermodal container terminal. They formulated a multiobjective model and designed an adaptive large neighborhood search (ALNS) algorithm combined with discrete event simulation (DES) to address the problem.…”
Section: Integrated Scheduling In Container Terminalmentioning
confidence: 99%
See 1 more Smart Citation
“…They verified the model's feasibility using the Gurobi solver. Liu et al [23] investigated the coscheduling problem involving railroad gantry cranes (RCOGC), YC, and IV in an intermodal container terminal. They formulated a multiobjective model and designed an adaptive large neighborhood search (ALNS) algorithm combined with discrete event simulation (DES) to address the problem.…”
Section: Integrated Scheduling In Container Terminalmentioning
confidence: 99%
“…Equations ( 16)-( 22) mirror the role for the QC as Equations ( 8)-( 14) do for the IGV. Equation (23) specifies that QC q operating on bay a loads the designated containers into bay a. Equation (24) states that if container i is the first loading task assigned to QC q, and it is designated to be loaded at bay a, then bay a will be the initial bay processed by QC q.…”
Section: Constraints (1) Igv Operational Constraintsmentioning
confidence: 99%