2021
DOI: 10.52547/jimp.11.3.181
|View full text |Cite
|
Sign up to set email alerts
|

Integrated Scheduling of Multi-Stage Production System and Transportation in the Supply Chain by Considering the Sequence Dependent Setup Time

Abstract: In this research, an integrated scheduling problem of job shop systems with an assembly stage and transportation to minimize the total tardiness time is studied. In this problem, the parts are processed in a job shop system and then assembled in the assembly stage. Ultimately, the products are shipped in packages to customers. Setup time is assumed to depend on sequence. At first, a mixed-integer linear model is developed. Since the problem is NP-hard, a hybrid imperialist competitive and simulated annealing (… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles